Work Details : Material – Item Unit of Measure mismatch with vendor unit of measure.
Unable to create PO
Expected Solution : Provide the solution to fix the issue.
Type : Documentation and guidance
If required schedule a meeting and guide us the solution through screen share.
Expected Resolutions Time : 3 days (24+24+24)
Initial Response : 4 hrs.