Ariba – Break Fix

SME /Projects /Ariba – Break Fix

Project Description

Work Details             :  Material – Item Unit of Measure mismatch with vendor unit of measure.
Unable to create PO

 

Expected Solution   :  Provide the solution to fix the issue.

Type                            :  Documentation and guidance

If required schedule a meeting and guide us  the solution through  screen share.

Expected Resolutions Time  :  3 days (24+24+24)

Initial Response                      :  4 hrs.